Viscount Announces BLM Approval for Drill Pads and New Road Construction at Flint Canyon, Cherry Creek, NV

MarketwiredMarketwire.comViscount Announces BLM Approval for Drill Pads and New Road Construction at Flint Canyon, Cherry Creek, NV

http://www.marketwire.com Marketwired en Copyright: (C) Marketwired 1 http://www.marketwire.com/rss/marketwire_logo.jpg http://www.marketwire.com

VANCOUVER, BRITISH COLUMBIA–(Marketwired – June 22, 2016) – Viscount Mining Corp. (TSX VENTURE:VML)(OTCQB:VLMGF) (“Viscount” or “the Company”), is pleased to announce the Company has now received approval at Flint Canyon for new drill hole pad locations, sumps, and road construction under a Notice of Intent (“NOI”) submitted to the Nevada Bureau of Land Management (“BLM”) earlier this spring. With this approval Viscount will have a 7,046 ft. new road, with Phase 1 of the 2016 RC drill program which will consist of approximately 18 holes for 4,380m (14,366 feet) starting at Flint Canyon scheduled for early August.

About Flint Canyon

The 2015 mapping at Flint Canyon found the area to be much more complexly faulted than previously indicated on the Adair 1961 geologic base map. Summit’s mapping program found that east-west orientated faults and fractures, which are important ore controlling structures at the Ticup and Star Mines, also occur in the area. The Flint Canyon area contains highly dissected fault blocks of the Dunderberg Shale with the underlying Marjum Limestone and overlying Notch Peak Limestone. The Pogonip Formation overlies the Notch Peak and both units are important host rocks for Carlin-type gold mineralization in east-central Nevada.

Jasperoid occurrences in Nevada are extremely significant in context to Carlin-type gold deposits and mineralized jasperoid outcrops are common throughout the Flint Canyon area. They occur principally along the base of the Dunderberg Shale but other outcrops are found along Pogonip-Notch Peak contact. Many major gold discoveries have been made based on the presence of outcropping, weakly mineralized jasperoid hosted in and along bedding contacts of carbonate rocks. At Flint Canyon, jasperoid is found in the same carbonate rocks that are prolific host rocks at nearby large gold deposits (Newmont Mining-Long Canyon).

The jasperoid beds, interpreted as west dipping tabular features, occur along the base of the Dunderberg Shale and within the Pogonip group limestone. Summit’s geological team indicated that the Dunderberg Shale is generally recessive and is exposed mainly along the outcropping contacts with more competent rocks. The Dunderberg appears to be moderately altered throughout its distribution, and at Flint Canyon it experienced widespread and significant alteration by hydrothermal fluids. The underlying Marjum Limestone is usually competent and unaltered, while the overlying Pogonip exhibits variable alteration.

Jim MacKenzie, Viscount President and CEO stated: “We are very excited that phase 1 of this year’s drill program is starting at the Flint Canyon area which exhibits alteration and mineralization characteristic of Carlin-type gold deposits.”

Qualified Persons

The exploration and drill programs are being managed by David Tretbar, Summit Exploration’s Executive Vice President, Exploration and Mineral Resources, a Qualified Person as defined by NI 43-101. Mr. Tretbar is a registered Professional Geologist in Arizona (# 48036) and a Certified Professional Geologist (CPG # 11086) with the American Institute of Professional Geologists.

Mark J. Abrams, M.Sc., P.G., R.G., C.P.G., an independent consulting geologist who is a “Qualified Person” reviewed, prepared and supervised the preparation or approval of the scientific and technical content in the news release as defined under National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43- 101”).

About Viscount Mining (TSX VENTURE:VML) (OTCQB:VLMGF)

Viscount Mining is an exploration company with a portfolio of gold and silver properties in the Western United States, including Cherry Creek in Nevada and Silver Cliff in Colorado. Cherry Creek is comprised of more than 9,000 acres, all 100% owned, and includes more than 20 past producing mines. Viscount has entered into an exploration earn-in agreement with Sumitomo Corporation covering the Cherry Creek property. Sumitomo can earn in up to a 75% interest in the property by producing a feasibility study and by spending in addition a minimum of US$10,000,000 in exploration and development expenses by the eighth anniversary of the earn-in agreement. Silver Cliff in Colorado is comprised of 96 lode claims, covering much of the historical past-producing mineral districts of Silver Cliff and Rosita Hills.

For additional information regarding the above noted property and other corporate information, please visit the Company’s website at www.viscountmining.com.

About Sumitomo Corporation

Sumitomo Corporation is one of the largest integrated trading and investment companies in Japan. Sumitomo Corporation, a Fortune 500 company, conducts commodity transactions in all industries utilizing worldwide networks, provides related customers with various financing, serves as an organizer and a coordinator for various projects, and invests in businesses from the information industry to the retailing industry. Summit Mining Exploration, Inc. is a wholly-owned subsidiary of Sumitomo Corporation and is headquartered in Colorado, USA. For more information about Sumitomo Corporation, visit www.sumitomocorp.co.jp.

ON BEHALF OF THE BOARD OF DIRECTORS

Jim MacKenzie, President, CEO and Director

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Statements

This news release contains certain statements that may be deemed “forward-looking” statements. Forward looking statements are statements that are not historical facts and are generally, but not always, identified by the words “expects”, “plans”, “anticipates”, “believes”, “intends”, “estimates”, “projects”, “potential” and similar expressions, or that events or conditions “will”, “would”, “may”, “could” or “should” occur. Although Viscount Mining Corp. believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in forward looking statements. Forward looking statements are based on the beliefs, estimates and opinions of Viscount Mining Corp. management on the date the statements are made. Except as required by law, Viscount Mining Corp. undertakes no obligation to update these forward-looking statements in the event that management’s beliefs, estimates or opinions, or other factors, should change.

]]>
Viscount Investor Relations
604-960-0535
[email protected]
]]>
Wed, 22 Jun 2016 13:12:00 GMT