Serinus Energy – Q3 2016 Operations Update

CALGARY, ALBERTA–(Marketwired – Oct. 25, 2016) – Serinus Energy Inc. (“Serinus“, “SEN” or the “Company“) (TSX:SEN) (WARSAW:SEN) is pleased to provide the following update for its operations for the third quarter of 2016.

Third Quarter Production and Realized Prices

Overall production for Q3 was 1,007 boe/d, 17% lower than the 1,206 boe/d in Q2 2016 and 25% lower than the 1,336 boe/d in Q3 2015. Oil averaged 787 bbl/d, and gas was 1.3 MMcf/d. The decrease vs. the prior quarter was due to pump failures on the CS-3 and CS-1 wells in Chouech Es Saida for aggregate downtime of 78 days as parts had to be sourced from outside the country. CS-3 and CS-1 resumed production in early September and early October respectively. Estimated realized prices during the quarter were $43.17/bbl and $4.53/Mcf.

Production for October to date has averaged approximately 1,214 boe/d, comprised of 889 bbl/d of oil and 1.95 MMcf/d of natural gas.

Note: the volumes and prices referred to above are subject to minor revisions once final allocations and invoices are received.

Outlook

The Company’s focus remains on reducing costs wherever possible while maintaining existing production in Tunisia. The 2016 budget will be re-examined on an ongoing basis in the event that management becomes confident that current oil prices can be sustained, and that funding is available to recommence drilling.

In Romania, Serinus will concentrate on moving the Moftinu-1001 discovery into the experimental production phase, pending ratification of the Phase 3 extension of the Satu Mare Licence.

The Company is examining several alternatives for funding the development activities in both Romania and Tunisia.

Executive Change

Aaron LeBlanc, Vice President of Exploration, has left the Company to pursue other opportunities. Mr. LeBlanc was promoted to Vice President in March 2014, and had worked for Serinus since 2011. The Company wishes him all the best in his new endeavors.

Abbreviations

bbl Barrel(s) bbl/d Barrels per day
boe Barrels of Oil Equivalent boe/d Barrels of Oil Equivalent per day
Mcf Thousand Cubic Feet Mcf/d Thousand Cubic Feet per day
MMcf Million Cubic Feet MMcf/d Million Cubic Feet per day
Mcfe Thousand Cubic Feet Equivalent Mcfe/d Thousand Cubic Feet Equivalent per day
MMcfe Million Cubic Feet Equivalent MMcfe/d Million Cubic Feet Equivalent per day
Mboe Thousand boe Bcf Billion Cubic Feet
MMboe Million boe Mcm Thousand Cubic Metres
CAD Canadian Dollar USD U.S. Dollar
$MM Millions of Dollars $M Thousands of Dollars

Cautionary Statement:

BOEs may be misleading, particularly if used in isolation. A BOE conversion ratio of 6 Mcf:1 bbl is based on an energy equivalency conversion method primarily applicable at the burner tip and does not represent a value equivalency at the wellhead.
Test results are not necessarily indicative of long-term performance or of ultimate recovery. The test data contained herein is considered preliminary until full pressure transient analysis is complete.

About Serinus

Serinus is an international upstream oil and gas exploration and production company that owns and operates projects in Tunisia, and Romania.

For further information, please refer to the Serinus website (www.serinusenergy.com).

Translation: This news release has been translated into Polish from the English original.

Forward-looking Statements This release may contain forward-looking statements made as of the date of this announcement with respect to future activities that either are not or may not be historical facts. Although the Company believes that its expectations reflected in the forward-looking statements are reasonable as of the date hereof, any potential results suggested by such statements involve risk and uncertainties and no assurance can be given that actual results will be consistent with these forward-looking statements. Various factors that could impair or prevent the Company from completing the expected activities on its projects include that the Company’s projects experience technical and mechanical problems, there are changes in product prices, failure to obtain regulatory approvals, the state of the national or international monetary, oil and gas, financial, political and economic markets in the jurisdictions where the Company operates and other risks not anticipated by the Company or disclosed in the Company’s published material. Since forward-looking statements address future events and conditions, by their very nature, they involve inherent risks and uncertainties and actual results may vary materially from those expressed in the forward-looking statement. The Company undertakes no obligation to revise or update any forward-looking statements in this announcement to reflect events or circumstances after the date of this announcement, unless required by law.

Serinus Energy Inc. – Canada
Gregory M. Chornoboy
ector – Capital Markets & Corporate Development
+1-403-264-8877
[email protected]

Serinus Energy Inc. – Poland
Jakub J. Korczak
Vice President Investor Relations & Managing Director CEE
+48 22 414 21 00
[email protected]