ALORO Mobilizes Bulldozer for Road Construction and Building of Drill Pads

VANCOUVER, B.C., Nov. 09, 2018 (GLOBE NEWSWIRE) — ALORO MINING CORP. – (the “Company”) is pleased to announce that it has mobilized a D8 bulldozer to the Los Venados property for road construction and building of drill pads. The bulldozer was expedited from Hermosillo, Sonora to Mulatos, Sonora this morning and will arrive later today.

On Saturday the bulldozer will start to construct the permitted 3.63 km access road to the permitted 12 drill sites in order to build the drill pads. The road will allow us to use a Reverse Circulation (RC) Drill Rig where it has been proven to get better recovery in the area. The road construction to the drill sites becomes a valuable exploration program in itself as it will open up new exposures for sampling in mineralized areas and structure that were previously undercover. The new road cut and drill pads will be sampled and geologically mapped. 

Thomas A. Doyle, President, CEO, statedI look forward to seeing what the road cut uncovers and preparing for the drilling program in the next few weeks”

About Aloro Mining Corp.

Aloro controls the 3,199 hectare Los Venados Project which is located in the central part of the Mulatos Gold District and the western border of which property is shared with Agnico Eagle Mines Limited where it operates the La India open pit mine.  The Los Venados Project is directly adjacent to the active Mulatos open pit of Alamos Gold Inc. to the south.  The known mineralization within the Mulatos District is gold-dominant, with accessory silver and copper.

ALORO MINING CORP.

Per: “Thomas A. Doyle”
Thomas A. Doyle
President & CEO

http://www.aloromining.com/

For further information, please contact:
Thomas A. Doyle
Logan Anderson
Phone: (604) 689-5722
Email: [email protected]

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.