Bay Street News

Centerra Gold Reports Kumtor Mine Receives 2016 Mine Plan Approval

TORONTO, ON–(Marketwired – June 27, 2016) – Centerra Gold Inc. (TSX: CG) reports that its Kumtor operation, located in the Kyrgyz Republic, has received the necessary approvals of Kumtor’s 2016 annual mine plan.

Today, the Kyrgyz Republic State Agency for Environmental Protection and Forestry (“SAEPF”) issued its official environmental expertise (approval) on Kumtor’s 2016 mine plan. Together with the approvals earlier this year of the industrial safety and subsoil use, components of the 2016 annual mine plan, and the approvals of the maximum allowable emissions permit, the maximum allowable discharge permit, and the waste disposal permit, Kumtor now has all the necessary permits and approvals in place for continuous operations throughout the second half of 2016.

About Centerra

Centerra is a Canadian-based gold mining company focused on operating, developing, exploring and acquiring gold properties in Asia, North America and other markets worldwide. Centerra is the largest Western-based gold producer in Central Asia. Centerra’s shares trade on the Toronto Stock Exchange (TSX) under the symbol CG. The Company is headquartered in Toronto, Ontario, Canada.

Caution Regarding Forward-Looking Information

Information contained in this news release which are not statements of historical facts may be “forward- looking information” for the purposes of Canadian securities laws. Such forward-looking information involves risks, uncertainties and other factors that could cause actual results and performance to differ materially from those expressed or implied by such forward looking information. The words “believe”, “expect”, “anticipate”, and similar expressions identify forward-looking information. These forward-looking statements relate to, among other things, the expectations for continuous operations at the Kumtor Mine in the second half of 2016.

Forward-looking information is necessarily based upon a number of estimates and assumptions that, while considered reasonable by Centerra, are inherently subject to significant political, business, economic and competitive uncertainties and contingencies. Known and unknown factors could cause actual results to differ materially from those projected in the forward looking information. Factors that could cause actual results or events to differ materially from current expectations include, among other things, political risks associated with the Company’s operations in the Kyrgyz Republic, the impact of changes in, or to the more aggressive enforcement of, laws, regulations and government practices in the Kyrgyz Republic, including any unjustified civil or criminal action against the Company, its affiliates or its current or former employees; the impact of any actions taken by the Kyrgyz Republic Government and Parliament relating to the agreements governing the Kumtor project which are inconsistent with the rights of Centerra and Kumtor Gold Company under such agreements; any impact on the purported cancellation of Kumtor’s land use rights at the Kumtor Project pursuant to a court claim commenced by the Kyrgyz Republic General Prosecutor’s Office; the risks related to other outstanding litigation affecting the Company’s operations in the Kyrgyz Republic; risks related to operational matters and geotechnical issues at the Kumtor Project, including, movement of the Davidov

1 University Avenue, Suite 1500
Toronto, ON
M5J 2P1
tel 416-204-1953
fax 416-204-1954
www.centerragold.com

Glacier, waste and ice movement, the continued performance of the buttress, the occurrence of further ground movements, inherent risks associated with the use of sodium cyanide in the mining operations; the adequacy of the Company’s insurance to mitigate operational risks; mechanical breakdowns; the Company’s ability to obtain the necessary permits and authorizations to (among other things) raise the tailings dam at the Kumtor Project to the required height; the occurrence of any labour unrest or disturbance; the risk that Centerra’s workforce may be exposed to widespread epidemic; seismic activity in the vicinity of the Company’s operations; long lead times required for equipment and supplies; reliance on a limited number of suppliers for certain consumables, equipment and components; and the Company’s ability to attract and retain qualified personnel. See section titled “Risk Factors” in the Company’s most recently filed Annual Information Form available on SEDAR at www.sedar.com.

There can be no assurances that forward-looking information and statements will prove to be accurate, as many factors and future events, both known and unknown could cause actual results, performance or achievements to vary or differ materially, from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements contained herein or incorporated by reference. Accordingly, all such factors should be considered carefully when making decisions with respect to Centerra, and prospective investors should not place undue reliance on forward looking information. Forward-looking information is as of June 27, 2016. Centerra assumes no obligation to update or revise forward looking information to reflect changes in assumptions, changes in circumstances or any other events affecting such forward-looking information, except as required by applicable law.

Additional information on Centerra is available on the Company’s web site at www.centerragold.com and at SEDAR at www.sedar.com.

Attachment Available: http://www.marketwire.com/library/MwGo/2016/6/27/11G104355/21-Kumtor_receives_mine_plan_approval-FINAL-868f30adc26b836ea1596fae7736b74e.pdf

For more information:
John W. Pearson
Vice President, Investor Relations
(416) 204-1953
Email contact