City of Porterville orders 10 forty foot all-electric buses from GreenPower

PORTERVILLE, CA–(Marketwired – March 09, 2017) – GreenPower Motor Company Inc. (TSX VENTURE: GPV) (OTCQB: GPVRF) (“GreenPower” or the “Company”) announces that it has entered into a sales contract to supply 10 GreenPower EV350 40-foot zero-emission all-electric transit buses with the City of Porterville in California for deployment on all nine Porterville Transit routes, and includes 11 charging systems to be installed at the maintenance facility and transit center for a total purchase price of approximately $9 Million.

The contract provides the City of Porterville or other customers, an option to purchase an additional twenty buses with the same terms and conditions as the initial purchase.

“We are going to be the first transit fleet in California to be zero emissions/all electric and look forward to working with GreenPower to replace our aging and polluting active-fleet,” commented Richard Tree, Transit Manager, Porterville Transit. “Companies like GreenPower are driving the industry forward, and making all-electric the new norm in public transportation, while playing a significant role in accomplishing our mission to improve the environment in our community and the Valley as a whole.”

The first bus is scheduled to be delivered in the fall of this year with the remaining nine buses three to four months later. GreenPower has also agreed to make available for use as a spare bus, an EV350 40-foot zero-emission all-electric transit bus when GreenPower is not using this vehicle for demonstration purposes.

“This conversion of the entire Porterville transit system to GreenPower zero emission buses is the most innovative project that I have been part of to date and it is ground-breaking for the industry,” stated Brendan Riley, President of GreenPower. “In addition, we have 20 buses available on this contract for other transit properties including the San Joaquin Valley Air Pollution Control District who are seeking to deploy not just a zero-emission vehicle, but a zero-emission solution.”

About GreenPower Motor Company Inc.

GreenPower Motor Company Inc. develops electric powered vehicles for commercial markets. GreenPower offers a range of electric powered buses deploying electric drive and battery technologies with a lightweight chassis and low floor or high floor body. GreenPower’s bus is based on a flexible clean sheet design and utilizes a custom battery management system and a proprietary Flex Power system for the drive motors. GreenPower integrates global suppliers for key components such as Siemens for the two drive motors, Knorr for the brakes, ZF for the axles and Parker for the dash and control systems. This OEM platform allows GreenPower to meet the specifications of various operators while providing standard parts for ease of maintenance and accessibility for warranty requirements. For further information go to www.greenpowerbus.com

Forward-Looking Statements

This document contains forward-looking statements relating to, among other things, GreenPower’s business and operations and the environment in which it operates. Forward-looking statements are not based on historical facts, but rather on current expectations and projections about future events, and are therefore subject to risks and uncertainties which could cause actual results to differ materially from the future results expressed or implied by the forward-looking statements. These statements generally can be identified by the use of forward-looking words such as “may”, “should”, “will”, “could”, “intend”, “estimate”, “plan”, “anticipate”, “expect”, “believe” or “continue”, or the negative thereof or similar variations. These statements are not guarantees of future performance and involve risks and uncertainties that are difficult to predict or are beyond GreenPower’s control. These risks include the risk that: GreenPower may not receive all necessary federal and state compliance approvals; the regulations and compliance standards may change such that GreenPower would not able to supply buses in the required timeframe; and such other risks and factors beyond the control of GreenPower. A number of important factors including those set forth in GreenPower’s public filings (filed under GreenPower’s profile on www.sedar.com) could cause actual outcomes and results to differ materially from those expressed in these forward-looking statements. Consequently, readers should not place any undue reliance on such forward-looking statements. In addition, these forward-looking statements relate to the date on which they are made. GreenPower disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. All amounts in U.S. dollars. © 2017 GreenPower Motor Company Inc. All rights reserved.

For further information contact:
Fraser Atkinson, Chairman
(604) 220-8048