Cornish Metals Releases Audited Financial Statements and Management’s Discussion and Analysis for the Year Ended 31 December 2024

VANCOUVER, British Columbia, March 13, 2025 (GLOBE NEWSWIRE) — Cornish Metals Inc. (TSX-V/AIM: CUSN) (“Cornish Metals” or the “Company”), a mineral exploration and development company focused on its 100% owned and permitted South Crofty tin project in Cornwall, United Kingdom, is pleased to announce that it has released its audited financial statements and management, discussion and analysis (“MD&A”) for the year ended December 31, 2024. The reports are available under the Company’s profile on SEDAR+ (www.sedarplus.ca) and on the Company’s website (www.cornishmetals.com).

Highlights for the year ended December 31, 2024 and for the period ending March 12, 2025

(All figures expressed in Canadian dollars unless otherwise stated)

Don Turvey, CEO and Director of Cornish Metals, stated: “2024 was another important year for Cornish Metals and the advancement of South Crofty towards production with activity levels on-site remaining high and momentum building. Notable milestones achieved include the completion of the South Crofty PEA that confirms the project’s potential to be a low-cost and long-life tin mining operation. The PEA results are compelling with a post-tax NPV8% of US$201 million and IRR of about 30%, representing a strong foundation with potential for significant upside. Teams are working around the clock refurbishing the NCK shaft as they continue to progress deeper down the shaft.

2025 commenced with a strong endorsement from our existing shareholders, including Vision Blue, and we are pleased to welcome the UK’s National Wealth Fund and other new investors as shareholders in Cornish Metals, having supported a £57.4 million fundraise. This will enable the Company to maintain its strong momentum and further unlock the project’s potential by delivering crucial milestones expected in the coming year including the completion of mine dewatering and shaft refurbishment, the start of early project works, placing orders for long-lead items, and concluding the project finance process.”

Review of activities

Strategic investment and fundraise

On January 28-31, 2025, the Company announced a Fundraise totaling £57.4 million that was anchored by NWF and Vision Blue, conditionally investing £28.6 million and £18.1 million, respectively. A further £10.7 million was raised from existing shareholders and new investors, including £1.4 million from a retail offer. The Fundraise is being undertaken in two tranches with the first tranche of 133,817,678 shares issued on February 7, 2025. The second tranche of 583,325,689 shares is expected to be issued on or around March 24, 2025, subject to shareholder approval at the Special Meeting to be held on March 18, 2025.

The Fundraise is expected to provide financial runway through to the end of Q1 2026 and will enable the Company to further de-risk the South Crofty Project and advance it towards a formal final investment decision.by:

Appointment of permanent CEO

On August 11, 2024, the Company announced the appointment of Mr. Don Turvey as CEO and an executive director of the Company effective October 9, 2024, following receipt of a UK work visa. Mr. Turvey relocated from South Africa to Cornwall, where he is now based. Mr. Turvey is an experienced mining executive with more than 40 years of experience in the sector. He has been CEO of private, ASX and AIM-listed mining companies where he has successfully secured funding and taken new projects and historic mines through to production, as well as leading a number of M&A transactions. Upon Mr. Turvey’s appointment, Ken Armstrong returned to the position of non-executive director and continues as Chair of the Company’s Audit Committee. Patrick Anderson returned to the position of non-executive Chair of the Board of Directors of the Company effective September 30, 2024.

US$9.1 million (equivalent to £7.0 million) credit facility with Vision Blue

The Company entered into a non-dilutive US$9.1 million (equivalent to £7.0 million) secured credit facility with Vision Blue to support the continued development of South Crofty (refer news release dated October 15, 2024). The proceeds of the credit facility were used for the Company’s general operating and corporate purposes. The credit facility has a maturity date of March 31, 2025 and has a fixed borrowing cost of 15% per annum. The security comprises fixed and floating charges over the Company’s assets except mineral rights in the UK which are already pledged as security under the royalty agreement with Osisko Gold Royalties Limited (“Osisko”). The credit facility is being repaid through a set-off with the proceeds from the Fundraise mentioned above.

Appointment of Endeavour Financial

Endeavour was appointed as the Company’s financial adviser to secure project financing for the construction of South Crofty (refer news release dated October 9, 2024). Endeavour will advise the Company on funding options on the basis of the completed PEA and ongoing engineering studies. Various sources of funding are being assessed to deliver an optimal project financing solution with a successful conclusion to the project financing process expected in the second half of 2025.

Preliminary Economic Assessment completed for South Crofty

The results of the South Crofty PEA were released on April 30, 2024, validating the Project’s economic viability and potential to be a low-cost and long-life tin mining operation with a current 14-year LOM. South Crofty is expected to produce a clean, high-grade tin concentrate and to be an important tin producer in Europe, supplying into the growing demand for this critical metal that is essential for the energy transition.

Key highlights from the PEA include:

Further details can be found in the news release dated April 30, 2024 and the Technical Report entitled “South Crofty PEA” prepared in accordance with NI 43-101 and filed on SEDAR+.

Near-mine Exploration Target at South Crofty

The near mine Exploration Target at South Crofty announced on November 13, 2024 points to potential additional mineralization upside of 6Mt to 13Mt, at a tin grade of 0.5% to 1.8%, beyond the current South Crofty Mineral Resource in the Lower Mine area. This identifies the near-term resource development pathway at South Crofty.

South Crofty is one of the highest-grade tin resources in the world with a tin grade of 1.50% in the Indicated category and historically the mine consistently increased its Mineral Resource in line with production each year over the last 20 years of operation.

The near mine Exploration Target was primarily based on extrapolation of known, previously mined structures beyond the limits of the current South Crofty Mineral Resource. The mineralization around South Crofty remains open along strike and down dip providing further potential beyond the near mine Exploration Target. The Exploration Target does not consider the wider opportunities within the South Crofty mining permission area, which also shows significant potential and includes the Wide Formation exploration project, or within the wider region in Cornwall where Cornish Metals has extensive mineral rights holdings.

Refurbishment of New Cook’s Kitchen Shaft – second phase commenced

Phase 2 of NCK shaft refurbishment commenced in July 2024, following the on-schedule installation of a new double-deck equipping stage and modified main cage, providing a safe and stable work platform enabling faster replacement of the old shaft timbers with new steel buntons and guides (refer news release dated July 10, 2024). Rephasing shaft refurbishment, concurrent with mine dewatering, will improve the functionality of NCK shaft, enable larger equipment to access the mine at an earlier stage in its re-development and ensure that high health and safety standards are applied as the underground mine workings are accessed.

The NCK shaft winding engines and associated winding apparatus, including the refurbished south headframe, enable safe access to NCK shaft for personnel and materials as required to facilitate the shaft refurbishment works and subsequent access to the dewatered deep workings of the mine. Mine dewatering continues with the submersible pumps and water treatment plant operating to specifications.

NCK shaft refurbishment has reached approximately 270 metres below surface and the water level in NCK shaft is currently at approximately 275 metres below surface. The treated water being discharged to the Red River is consistently well within the permitted standards.

Shaft refurbishment and mine dewatering to the 400-fathom level (approximately 730 metres below surface) are expected to be completed in Q4 2025.

Land purchase adjacent to South Crofty surface infrastructure

On May 21, 2024, the Company announced the purchase of a 7.7 acre land package situated to the south of Kerrier Way, immediately adjacent to important South Crofty surface infrastructure. The land purchase removes reliance on existing right-of-passage agreements, providing the Company with direct access to all surface infrastructure, as well as additional space for future site works, opportunities for potential operating cost savings, renewable energy initiatives and improved overall property security (refer news release dated May 21, 2024).

South Crofty new offices, stores and workshops

A detailed planning application for new offices, stores and workshops for South Crofty has been submitted to Cornwall Council. This work has been enabled by receipt of a UK Shared Prosperity Grant and provides the opportunity to build modern, efficient facilities at the proposed centre of mining operations at NCK shaft.

Exploration drill program at Carn Brea South

A 9,000-meter exploration drill program was completed at the Wide Formation target in the Carn Brea South exploration area with final drill results reported in August 2024 (refer news release dated August 18, 2024). The drill program was designed to test the geometry and the continuity of tin mineralization discovered by the Company at the Wide Formation target (refer news release dated January 10, 2023).

The mineralization style in the Wide Formation, comprising pervasive tourmaline and quartz (termed ‘blue peach’), is similar in character to that associated with No. 8 Lode, one of the most prolific tin producing lodes in the latter years of operation of the South Crofty mine. The Wide Formation structure has been confirmed over a strike length of over 2,500 meters along strike (northeast to southwest) and a downdip extent of at least 800 meters (north to south), with true thicknesses ranging from approximately 2 to 10 meters. The structure remains open at depth and along strike. Notable tin intercepts from the Wide Formation include 1.21 meters grading 0.87% Sn in CB23_004.

Drilling identified a new mineralized structure lying directly beneath the Great Flat Lode (named the “Great Flat Lode Splay”), and several high-grade, steeply dipping tin zones between the Great Flat Lode and the Wide Formation locally referred to as ‘Droppers’. Notable tin intercepts from the newly identified Great Flat Lode Splay include 3.38 meters grading 1.01% Sn in CB23_002. Notable tin intercepts from the ‘Dropper’ zones include 3.09 meters grading 1.21% Sn in CB23_001.

Drilling also intersected a new tin structure interpreted as the eastern extension of the Great Condurrow Mine’s Main Lode. Notable tin and copper (“Cu”) intercepts from the new structure include 2.11 meters grading 0.58% Sn and 5.48% Cu in CB23_011.

Sale of Mactung and Cantung royalties

The Company completed the sale of its royalty interests on the Mactung and Cantung tungsten projects located in Northern Canada to Elemental Altus for a total cash consideration of US$4.5 million (refer news release dated July 21, 2024). The initial cash consideration of US$3.0 million was received by the Company on August 1, 2024 (refer news release dated August 4, 2024), with the balance of US$1.5 million due by August 1, 2025.

Sale of Nickel King Property

On June 16, 2024, the Company entered into a binding letter of intent with Northera for the sale of the Company’s 100% interest in the Nickel King Property for a total consideration of up to $8 million (refer news release dated June 16, 2024). Under the terms of the letter of intent, Northera made a first non-refundable cash payment of $100,000 (received on June 14, 2024). The Company and Northera subsequently amended the letter of intent whereby Northera made a second non-refundable cash payment of $150,000 (received on September 11, 2024) and a third and final non-refundable cash payment of $800,000 is now due on or before March 31, 2025. Upon receipt of the full aggregate cash consideration of $1,050,000 the Company will transfer the Nickel King Property to Northera. There are no further amendments to the letter of intent and, as previously agreed, upon completion of a go public transaction by Northera, resulting in a listing of securities on the TSX Venture Exchange, or other stock exchange, Northera will issue to the Company common shares in the capital of Northera having an aggregate market value equal to $7.0 million.

Appointment of Samantha Hoe-Richardson as independent non-executive director

On January 8, 2024, the Company announced that Samantha Hoe-Richardson joined the Board of Directors as an independent non-executive director (refer news release dated January 8, 2024). Ms. Hoe-Richardson is an experienced non-executive director from a global mining, infrastructure and insurance background. She is currently a non-executive director of WE Soda Ltd, Assured Guaranty UK Ltd, Ascot Underwriting Limited and an independent advisor on climate change & sustainability to Laing O’Rourke. Ms. Hoe-Richardson was Head of Environment & Sustainable Development at Network Rail until 2017 and prior to that spent 16 years at Anglo American plc, latterly as Head of Environment. She previously worked in investment banking and audit. Ms. Hoe-Richardson holds a Masters Degree in Nuclear and Electrical Engineering from the University of Cambridge, and is also a non-practicing Chartered Accountant.

         
Financial highlights for the year ended December 31, 2024 and the eleven months ended December 31, 2023
         
  Year ended
December 31, 2024
  Eleven months ended
December 31, 2023
 
(Expressed in Canadian dollars)        
Total operating expenses 8,831,740   4,859,889  
Loss for the period 1,066,120   2,714,155  
Net cash used in operating activities (4,458,250 )                 (2,732,773 )
Net cash used in investing activities (24,944,106 ) (28,164,958 )
Net cash (used in) provided by financing activities 12,036,590   (32,082 )
Cash at end of the period 9,589,029   25,791,552  
         

The Company changed its financial year end from January 31 to December 31 with effect from December 31, 2023 with the result that the current period of reporting is the twelve months ended December 31, 2024. The comparative period of reporting is the eleven months ended December 31, 2023.

Outlook

As described above, the Company continues to advance and derisk the South Crofty tin project towards production. By the end of December 2025, the Company’s objectives are as follows:

ABOUT CORNISH METALS

Cornish Metals is a dual-listed mineral exploration and development company (AIM and TSX-V: CUSN) that is advancing the South Crofty tin project towards production. South Crofty:

The 2024 Preliminary Economic Assessment for South Crofty is preliminary in nature and includes Inferred Mineral Resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorised as Mineral Reserves. There is no certainty that the 2024 Preliminary Economic Assessment will be realised. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

TECHNICAL INFORMATION

This news release has been reviewed and approved by Mr. Owen Mihalop, MCSM, BSc (Hons), MSc, FGS, MIMMM, CEng, Chief Operating Officer for Cornish Metals Inc. who is the designated Qualified Person under NI 43-101 and the AIM Rules for Companies and a Competent Person as defined under the JORC Code (2012). Mr. Mihalop consents to the inclusion in this announcement of the matters based on his information in the form and context in which it appears.

ON BEHALF OF THE BOARD OF DIRECTORS

“Don Turvey”
Don Turvey

Engage with us directly at our investor hub. Sign up at: https://investors.cornishmetals.com/link/YeNAky

For additional information please contact:

     
Cornish Metals Fawzi Hanano
Irene Dorsman
investors@cornishmetals.com
info@cornishmetals.com
    Tel: +1 (604) 200 6664
SP Angel Corporate Finance LLP
(Nominated Adviser & Joint Broker)
Richard Morrison
Charlie Bouverat
Grant Barker
Tel: +44 203 470 0470
     
Hannam & Partners
(Financial Adviser)
Matthew Hasson
Andrew Chubb
Jay Ashfield
cornish@hannam.partners
Tel: +44 207 907 8500
     
Cavendish Capital Markets Limited
(Joint Broker)
Derrick Lee
Pearl Kellie
Tel: +44 131 220 6939
     
BlytheRay
(Financial PR)
Tim Blythe
Megan Ray
cornishmetals@blytheray.com
Tel: +44 207 138 3204
     

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Caution regarding forward looking statements

This news release contains certain “forward-looking information” and “forward-looking statements” (collectively, “forward-looking statements”). Forward-looking statements include predictions, projections, outlook, guidance, estimates and forecasts and other statements regarding future plans and operations, the realisation, cost, timing and extent of mineral resource or mineral reserve estimates, estimation of commodity prices, currency exchange rate fluctuations, estimated future exploration expenditures, costs and timing of the development of new deposits, success of exploration activities, permitting time lines, requirements for additional capital and the Company’s ability to obtain financing when required and on terms acceptable to the Company, future or estimated mine life and other activities or achievements of Cornish Metals, including but not limited to: the expected use of proceeds from the secured credit facility with Vision Blue; the balance of the cash consideration due to Cornish in respect of the sale of the Mactung and Cantung royalty interests; mineralisation at South Crofty, mine dewatering and construction requirements; the development, operational and economic results of the preliminary economic assessment, including cash flows, capital expenditures, development costs, extraction rates, recovery rates, mining cost estimates and returns; estimation of mineral resources; statements about the estimate of mineral resources and production of minerals; magnitude or quality of mineral deposits; anticipated advancement of the South Crofty project mine plan; exploration potential and project growth opportunities for the South Crofty tin project and other Cornwall mineral properties, the Company’s ability to evaluate and develop the South Crofty tin project and other Cornwall mineral properties, strategic vision of Cornish Metals and expectations regarding the South Crofty mine, timing and results of projects mentioned. Forward-looking statements are often, but not always, identified by the use of words such as “seek”, “anticipate”, “believe”, “plan”, “estimate”, “forecast”, “expect”, “potential”, “project”, “target”, “schedule”, “budget” and “intend” and statements that an event or result “may”, “will”, “should”, “could”, “would” or “might” occur or be achieved and other similar expressions and includes the negatives thereof. All statements other than statements of historical fact included in this news release, are forward-looking statements that involve various risks and uncertainties and there can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements.

Forward-looking statements are subject to risks and uncertainties that may cause actual results to be materially different from those expressed or implied by such forward-looking statements, including but not limited to: risks related to receipt of regulatory approvals, risks related to general economic and market conditions; risks related to the availability of financing; the timing and content of upcoming work programmes; actual results of proposed exploration activities; possible variations in Mineral Resources or grade; outcome of any future studies; projected dates to commence mining operations; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes, title disputes, claims and limitations on insurance coverage and other risks of the mining industry; changes in national and local government regulation of mining operations, tax rules and regulations. The list is not exhaustive of the factors that may affect Cornish’s forward-looking statements.

Cornish Metals’ forward-looking statements are based on the opinions and estimates of management and reflect their current expectations regarding future events and operating performance and speak only as of the date such statements are made. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ from those described in forward- looking statements, there may be other factors that cause such actions, events or results to differ materially from those anticipated. There can be no assurance that forward-looking statements will prove to be accurate and accordingly readers are cautioned not to place undue reliance on forward-looking statements. Accordingly, readers should not place undue reliance on forward-looking statements. Cornish Metals does not assume any obligation to update forward-looking statements if circumstances or management’s beliefs, expectations or opinions should change other than as required by applicable law.

Caution regarding non-IFRS measures

This news release contains certain terms or performance measures commonly used in the mining industry that are not defined under International Financial Reporting Standards (“IFRS”), including “all-in sustaining costs”. Non-IFRS measures do not have any standardized meaning prescribed under IFRS, and therefore they may not be comparable to similar measures employed by other companies. The data presented is intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS and should be read in conjunction with Cornish Metals’ consolidated financial statements and Management Discussion and Analysis, available on its website and on SEDAR+ at www.sedarplus.ca.

Market Abuse Regulation (MAR) Disclosure

The information contained within this announcement is deemed by the Company to constitute inside information pursuant to Article 7 of EU Regulation 596/2014 as it forms part of UK domestic law by virtue of the European Union (Withdrawal) Act 2018 as amended.

               
CONSOLIDATED STATEMENTS OF FINANCIAL POSITION
(Expressed in Canadian dollars)
               
  As at
December 31, 2024
    As at
December 31, 2023
 
               
ASSETS              
Current              
Cash $ 9,589,029     $ 25,791,552  
Marketable securities   2,874,696       2,665,454  
Receivables   2,697,326       1,112,638  
Prepaid expenses   504,902       591,264  
Deferred financing fees   637,718       135,242  
    16,303,671       30,296,150  
               
Deposits   64,341       85,954  
Property, plant and equipment   27,132,244       23,788,325  
Exploration and evaluation assets   79,961,014       50,050,323  
               
  $ 123,461,270     $ 104,220,752  
               
LIABILITIES              
               
Current              
Accounts payable and accrued liabilities $ 4,045,083     $ 5,063,940  
Deferred income   150,000        
Loan liability   13,457,169        
    17,652,252       5,063,940  
NSR liability   9,869,289       9,064,817  
    27,521,541       14,128,757  
SHAREHOLDERS’ EQUITY              
Capital stock   128,394,652       128,394,652  
Capital contribution   2,007,665       2,007,665  
Share-based payment reserve   1,353,933       711,690  
Foreign currency translation reserve   7,640,757       1,369,146  
Deficit   (43,457,278 )     (42,391,158 )
               
    95,939,729       90,091,995  
               
  $ 123,461,270     $ 104,220,752  
               
CONSOLIDATED STATEMENTS OF LOSS AND COMPREHENSIVE INCOME (LOSS)
(Expressed in Canadian dollars)
               
  Year ended
December 31,
2024
    Eleven months ended
December 31,

2023
 
               
EXPENSES              
Travel and marketing $ 920,371     $ 634,145  
Insurance   756,331       633,287  
Office, miscellaneous and rent   224,021       175,164  
Professional fees   2,039,252       1,048,676  
Generative exploration costs   13,771       25,680  
Regulatory and filing fees   98,127       86,760  
Share-based compensation   382,481       205,026  
Salaries, directors’ fees and benefits   4,397,386       2,051,151  
               
Total operating expenses   (8,831,740 )     (4,859,889 )
               
Interest income   559,982       1,695,837  
Interest expense   (511,309 )      
Foreign exchange gain (loss)   (250,787 )     394,621  
Gain on receipt of non-refundable deposit   84,968        
Impairment reversal of royalties   1,500,000        
Gain on disposal of royalties   4,675,904        
Unrealized loss on marketable securities   (119,786 )     (116,903 )
Loss on disposal of property, plant and equipment         (921 )
               
Loss before income taxes   (2,892,768 )     (2,887,255 )
               
Income tax recovery   1,826,648       173,100  
               
Loss for the period   (1,066,120 )     (2,714,155 )
               
Foreign currency translation   6,271,611       2,018,108  
               
Total comprehensive income (loss) for the period $ 5,205,491     $ (696,047 )
               
Basic and diluted loss per share $ (0.00 )   $ (0.00 )
               
Weighted average number of common shares outstanding   535,270,712       535,269,215  
               
CONSOLIDATED STATEMENTS OF CASH FLOWS        
(Expressed in Canadian dollars)
               
  Year ended
December 31,
2024
    Eleven months ended
December 31,

2023
 
               
CASH FLOWS FROM OPERATING ACTIVITIES              
Loss for the period $ (1,066,120 )   $ (2,714,155 )
Items not involving cash:              
Share-based compensation   382,481       205,026  
Interest expense   511,309        
Foreign exchange (gain) loss   250,787       (394,621 )
Gain on receipt of non-refundable deposit   (84,968 )      
Impairment reversal of royalties   (1,500,000 )      
Gain on disposal of royalties   (4,675,904 )      
Unrealized loss on marketable securities   119,786       116,903  
Loss on disposal of property, plant and equipment         921  
Income tax recovery   (1,826,648 )     (173,100 )
               
Income taxes received during the period   2,994,765       157,100  
               
Changes in non-cash working capital items:              
(Increase) decrease in receivables   675,905       (456,230 )
(Increase) decrease in prepaid expenses   189,160       (204,107 )
Increase (decrease) in accounts payable and accrued liabilities   (428,803 )     729,490  
               
Net cash used in operating activities   (4,458,250 )     (2,732,773 )
               
CASH FLOWS FROM INVESTING ACTIVITIES              
Acquisition of property, plant and equipment   (6,517,830)       (14,192,068)  
Acquisition of exploration and evaluation assets   (22,787,140)       (13,942,740)  
Proceeds from disposal of royalties   4,099,004        
Proceeds from receipt of non-refundable deposits   234,968        
(Increase) decrease in deposits   26,892       (30,150)  
               
Net cash used in investing activities   (24,944,106 )     (28,164,958 )
               
CASH FLOWS FROM FINANCING ACTIVITIES              
Proceeds from debt facility   12,311,356        
Increase in deferred financing fees   (274,766 )     (31,359 )
Lease payments         (723 )
               
Net cash provided by (used in) financing activities   12,036,590       (32,082 )
               
Change in cash during the period   (17,365,766 )     (30,929,813 )
Cash, beginning of the period   25,791,552       55,495,232  
Impact of foreign exchange on cash   1,163,243       1,226,133  
               
Cash, end of the period $ 9,589,029     $ 25,791,552  
               
Cash paid during the period for interest $     $  
               
Cash paid during the period for income taxes $     $ 11,012  
               
CONSOLIDATED STATEMENTS OF CHANGES IN SHAREHOLDERS’ EQUITY        
(Expressed in Canadian dollars)
                                               
            Share
          Share-   Foreign
             
  Capital stock subscriptions
        based
  currency
             
  Number of         received in
  Capital
  payment
  translation
        Shareholders’
 
  shares   Amount
  advance
  contribution
  reserve
  reserve
  Deficit
  equity – total
 
Balance at January 31, 2023 535,020,712   $ 128,377,152   $ 17,500   $ 2,007,665   $ 384,758   $ (648,962 ) $ (39,677,003 ) $ 90,461,110  
Warrant exercises 250,000     17,500     (17,500 )                    
Foreign currency translation                     2,018,108         2,018,108  
Share-based compensation                 326,932             326,932  
Loss for the period                         (2,714,155 )   (2,714,155 )
Balance at December 31, 2023 535,270,712   $ 128,394,652   $   $ 2,007,665   $ 711,690   $ 1,369,146   $ (42,391,158 ) $ 90,091,995  
                                               
Balance at December 31, 2023 535,270,712   $ 128,394,652   $   $ 2,007,665   $ 711,690   $ 1,369,146   $ (42,391,158 ) $ 90,091,995  
Foreign currency translation                     6,271,611         6,271,611  
Share-based compensation                 642,243             642,243  
Loss for the period                         (1,066,120 )   (1,066,120 )
Balance at December 31, 2024 535,270,712   $ 128,394,652   $   $ 2,007,665   $ 1,353,933   $ 7,640,757   $ (43,457,278 ) $ 95,939,729  
                                               