VANCOUVER, British Columbia, Feb. 06, 2020 (GLOBE NEWSWIRE) — NOVAGOLD RESOURCES INC. (“NOVAGOLD” or the “Company”) (NYSE American, TSX: NG) today announced that its flagship Donlin Gold project, which NOVAGOLD owns equally with Barrick Gold Corp. (“Barrick”), received the final State Right-of-Way (ROW) authorization for the buried natural gas pipeline, issued by the Alaska Department of Natural Resources (ADNR) on January 17, 2020. The ADNR also issued final authorization of the easement, land leases, land use permits, and material site authorizations for the proposed transportation facilities, and easement for the fiber optic cable on State lands on January 2, 2020. Additionally, ADNR denied an appeal and affirmed the Division of Mining, Land, and Water’s original January 18, 2019 approval of Donlin Gold LLC’s Reclamation Plan and its accompanied permit.“We are very pleased to see the issuance of key transportation and energy infrastructure approvals for Donlin Gold,” said Greg Lang, President and CEO. “These final State land authorizations are important for the advancement of Donlin Gold. These achievements would not have been possible without the dedication of the professionals at the Alaska Department of Natural Resources to advance permits and approvals for the project in a transparent as well as environmentally and socially responsible manner with strong adherence to governance best practices. We are proud of the work supporting the issuance of these permits carried out by the teams at Donlin Gold, Barrick and NOVAGOLD and appreciate the support and contributions from our Native Corporation partners, Calista Corporation and The Kuskokwim Corporation.” The receipt of the ROW authorization and other land leases and permits for the transportation and pipeline facilities are the latest in a growing list of Donlin Gold’s permitting approvals, including the jointly issued Federal Record of Decision received in August 2018. A number of other key State permits have also been finalized for the project, including the Alaska Pollutant Discharge Elimination System (APDES) water discharge permit, Prevention of Significant Deterioration (PSD) major source air quality permit, waste management permit, Reclamation Plan approval permit, and fish habitat permits for the mine site and transportation corridor.A buried natural gas pipeline delivers environmental benefits, cost efficiency and capability to transport large quantities of natural gas to power the remote project site. The proposed 316-mile pipeline would be 14 inches in diameter, typically buried at three to six feet deep, providing a reliable natural gas supply regardless of weather or season to support power generation at the Donlin Gold site.About NOVAGOLDNOVAGOLD is a well-financed precious metals company focused on the development of its 50%-owned Donlin Gold project in Alaska, one of the safest mining jurisdictions in the world. With approximately 39 million ounces of gold in the measured and indicated mineral resource categories, inclusive of proven and probable mineral reserves (541 million tonnes at an average grade of approximately 2.24 grams per tonne in the measured and indicated resource categories on a 100% basis),1 Donlin Gold is regarded to be one of the largest, highest-grade, and most prospective known open pit gold deposits in the world. According to the Second Updated Feasibility Study (as defined below), once in production, Donlin Gold is expected to produce an average of more than one million ounces per year over a 27-year mine life on a 100% basis. The Donlin Gold project has substantial exploration potential beyond the designed footprint which currently covers 1.9 miles (3 km) of an approximately five-mile (8 km) long gold-bearing trend. Current activities at Donlin Gold are focused on state permitting, optimization work, community outreach and workforce development in preparation for the construction and operation of this project. With a strong balance sheet, NOVAGOLD is well-positioned to fund its share of permitting and optimization advancement efforts at the Donlin Gold project.1 Donlin Gold data as per the Second Updated Feasibility Study (as defined herein). Donlin Gold measured resources of approximately 8 Mt grading 2.52 g/t and indicated resources of approximately 534 Mt grading 2.24 g/t, each on a 100% basis. Mineral resources have been estimated in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”).Scientific and Technical InformationSome scientific and technical information contained herein with respect to the Donlin Gold project is derived from the “Donlin Creek Gold Project Alaska, USA NI 43-101 Technical Report on Second Updated Feasibility Study” prepared by AMEC with an effective date of November 18, 2011, as amended January 20, 2012 (the “Second Updated Feasibility Study”). Kirk Hanson, P.E., Technical Director, Open Pit Mining, North America, (AMEC, Reno), and Gordon Seibel, R.M. SME, Principal Geologist, (AMEC, Reno) are the Qualified Persons responsible for the preparation of the independent technical report, each of whom are independent “qualified persons” as defined by NI 43-101.Clifford Krall, P.E., who is the Mine Engineering Manager for NOVAGOLD and a “qualified person” under NI 43-101, has approved and verified the scientific and technical information related to the Donlin Gold project contained in this press release.NOVAGOLD Contacts:
Mélanie Hennessey
Vice President, Corporate CommunicationsJason Mercier
Manager, Investor Relations604-669-6227 or 1-866-669-6227Cautionary Note Regarding Forward-Looking StatementsThis press release includes certain “forward-looking information” and “forward-looking statements” (collectively “forward-looking statements”) within the meaning of applicable securities legislation, including the United States Private Securities Litigation Reform Act of 1995. Forward-looking statements are frequently, but not always, identified by words such as “expects”, “anticipates”, “believes”, “intends”, “estimates”, “potential”, “possible”, and similar expressions, or statements that events, conditions, or results “will”, “may”, “could”, “would” or “should” occur or be achieved. Forward-looking statements are necessarily based on several opinions, estimates and assumptions that management of NOVAGOLD considered appropriate and reasonable as of the date such statements are made, are subject to known and unknown risks, uncertainties, assumptions and other factors that may cause the actual results, activity, performance or achievements to be materially different from those expressed or implied by such forward-looking statements. All statements, other than statements of historical fact, included herein are forward-looking statements. These forward-looking statements include statements regarding the potential development and construction of Donlin Gold; perceived merit of properties; potential benefits of a buried natural gas pipeline; the advancement of optimization studies at Donlin Gold; potential opportunities to enhance or maximize the value of Donlin Gold; sufficiency of funds for the Company to advance Donlin Gold without additional financing; the timing and likelihood of permits; the expectation regarding issuance of the dam safety certifications; opportunities to reduce capital outlays and improve project economics; mine life and production estimates at Donlin Gold; the exploration potential of Donlin Gold; mineral reserve and resource estimates; work programs; capital expenditures; timelines; strategic plans; and benefits of the Donlin Gold project and market prices for precious metals. In addition, any statements that refer to expectations, intentions, projections or other characterizations of future events or circumstances are forward-looking statements. Forward-looking statements are not historical facts but instead represent NOVAGOLD’s management expectations, estimates and projections regarding future events or circumstances on the date the statements are made.Important factors that could cause actual results to differ materially from expectations include the need to obtain additional permits and governmental approvals; the timing and likelihood of permits; the need for additional financing to explore and develop properties and availability of financing in the debt and capital markets; uncertainties involved in the interpretation of drilling results and geological tests and the estimation of reserves and resources; the need for continued cooperation between NOVAGOLD and Barrick Gold Corp. for the continued exploration, development and eventual construction of the Donlin Gold property; the need for cooperation of government agencies and native groups in the development and operation of properties; risks of construction and mining projects such as accidents, equipment breakdowns, bad weather, natural disasters, climate change, non-compliance with environmental and permit requirements, unanticipated variation in geological structures, ore grades or recovery rates; unexpected cost increases, which could include significant increases in estimated capital and operating costs; fluctuations in metal prices and currency exchange rates; whether a positive construction decision will be made regarding Donlin Gold; and other risks and uncertainties disclosed in reports and documents filed by NOVAGOLD with applicable securities regulatory authorities from time to time. The forward-looking statements contained herein reflect the beliefs, opinions and projections of NOVAGOLD on the date the statements are made. NOVAGOLD assumes no obligation to update the forward-looking statements of beliefs, opinions, projections, or other factors, should they change, except as required by law.Cautionary Note to United States InvestorsThis press release has been prepared in accordance with the requirements of the securities laws in effect in Canada, which differ from the requirements of U.S. securities laws. Unless otherwise indicated, all resource and reserve estimates included in this press release have been prepared in accordance with Canadian National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”) and the Canadian Institute of Mining, Metallurgy and Petroleum (CIM)—CIM Definition Standards on Mineral Resources and Mineral Reserves, adopted by the CIM Council, as amended (“CIM Definition Standards”). NI 43-101 is a rule developed by the Canadian Securities Administrators which establishes standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. Canadian standards, including NI 43-101, differ significantly from the requirements of the United States Securities and Exchange Commission (SEC) Industry Guide 7 (“SEC Industry Guide 7”), and resource and reserve information contained herein may not be comparable to similar information disclosed by U.S. companies. NOVAGOLD’s disclosure concerning Reserve & Resource Estimates remains consistent with NI 43-101. Under SEC Industry Guide 7, mineralization may not be classified as a “reserve” unless the determination has been made that the mineralization could be economically and legally produced or extracted at the time the reserve determination is made. SEC Industry Guide 7 normally does not permit the inclusion of information concerning “measured mineral resources”, “indicated mineral resources” or “inferred mineral resources” or other descriptions of the amount of mineralization in mineral deposits that do not constitute “reserves” under SEC Industry Guide 7 in documents filed with the SEC. Investors should also understand that “inferred mineral resources” have a great amount of uncertainty as to their existence and great uncertainty as to their economic and legal feasibility. Under Canadian rules, estimated “inferred mineral resources” may not form the basis of feasibility or pre-feasibility studies except in rare cases. Disclosure of “contained ounces” in a resource is permitted disclosure under Canadian regulations; however, the SEC normally only permits issuers to report mineralization that does not constitute “reserves” under SEC Industry Guide 7 as in-place tonnage and grade without reference to unit measures. The requirements of NI 43-101 for identification of “reserves” are also not the same as those of SEC Industry Guide 7, and reserves reported by NOVAGOLD in compliance with NI 43-101 may not qualify as “reserves” under SEC Industry Guide 7. Donlin Gold does not have known reserves, as defined under SEC Industry Guide 7. Accordingly, information concerning mineral deposits set forth herein may not be comparable with information made public by companies that report in accordance with SEC Industry Guide 7.On October 31, 2018, the SEC adopted a final rule (“New Final Rule”) that will replace SEC Industry Guide 7 with new disclosure requirements that are more closely aligned with current industry and global regulatory practices and standards, including NI 43-101. Companies must comply with the New Final Rule for the company’s first fiscal year beginning on or after January 1, 2021, which for NOVAGOLD would be the fiscal year beginning December 1, 2021. The New Final Rule provides that SEC Industry Guide 7 will remain effective until all registrants are required to comply with the New Final Rule, at which time SEC Industry Guide 7 will be rescinded. While early voluntary compliance with the New Final Rule is permitted, NOVAGOLD has not elected to comply with the New Final Rule at this time.
Bay Street News